Increasing and reducing electrical load 11 k.v c.t. and p.t. installation/replacement and general overhauling in installation of solar connections, and repair work of 11 kv metering cubicle at various places. replacement of bare conductor with 3x 120 + 1x1295 mm ab cable in different areas. increase the capacity of 33/11 k.v. substation vara from 1 x 8 mva to 2 x 8 and improvement and repair work in the sub-institute campus. hindi
|